Monday, December 21, 2009
Up to $11,000 @ 1% Toward Your Well!
Wednesday, May 6, 2009
THEY ARE MEETING, AND THEY NEED TO HEAR FROM US!
Please attend the meeting in your area if it has not already been held. If it has already been held, contact the contact person and ask them to send you information of the past meeting and notices of future meetings.
The Altamaha Regional Water Planning Council is holding its next meeting at the following time, date and location: 9:00 a.m. – 4:30 p.m., May 5, 2009, Southeastern Technical College – Vidalia Economic Development Center, 100 A Brinson Road, Vidalia, GA 30474
For additional information about the Altamaha Regional Water Planning Council please contact:
Kevin Farrell, Assistant Branch Chief – EPD Watershed Protection Branch, 404-675-1621, Kevin.Farrell@dnr.state.ga.us
The Coastal Georgia Regional Water Planning Council is holding its next meeting at the following time, date and location: 9:00 a.m. – 4:30 p.m., May 4, 2009, J.F. Gregory Park, Stevens Wetlands Education Center, Cedar Street Richmond Hill, GA 31324
For additional information about the Coastal Georgia Regional Water Planning Council please contact:
Jeff Larson, Assistant Branch Chief – EPD Watershed Protection Branch , 404-675-1664, Jeff.Larson@dnr.state.ga.us
The Coosa-North Georgia Regional Water Planning Council is holding its next meeting at the following time, date and location: 9:00 a.m. – 4:30 p.m., May 8, 2009, Appalachian Tech , 100 Campus Drive; Jasper, GA 30143
For additional information about the Coosa-North Georgia Regional Water Planning Council please contact:
Becky Champion, Assistant Branch Chief – EPD Watershed Protection Branch, 706-888-8351, Becky.Champion@dnr.state.ga.us
The Lower Flint-Ochlockonee Regional Water Planning Council is holding its next meeting at the following time, date and location: 9:00 a.m. – 4:30 p.m., May 6, 2009, Mitchell County EMC, 475 Cairo Highway, Camilla, GA 31730
For additional information about the Lower Flint-Ochlockonee Regional Water Planning Council please contact:
Tim Cash, Assistant Branch Chief - EPD Watershed Protection Branch, 404-675-1766, Tim.Cash@dnr.state.ga.us
The Middle Chattahoochee Regional Water Planning Council is holding its next meeting at the following time, date and location: 9:00 a.m. – 4:30 p.m., May 13, 2009, Callaway Gardens – Dogwood Room Mountain Creek Inn, 17800 US Hwy 27, Pine Mountain, GA 31822
For additional information about the Middle Chattahoochee Regional Water Planning Council please contact:
Tim Cash, Assistant Branch Chief - EPD Watershed Protection Branch, 404-675-1766, Tim.Cash@dnr.state.ga.us
The Middle Ocmulgee Regional Water Planning Council is holding its next meeting at the following time, date and location: 9:00 a.m. – 4:30 p.m., May 14, 2009, Amerson Water Treatment Plant, 703 Riverbend Road, Macon, GA 31211
For additional information about the Middle Ocmulgee Regional Water Planning Council please contact:
Kevin Farrell, Assistant Branch Chief – EPD Watershed Protection Branch, 404-675-1621, Kevin.Farrell@dnr.state.ga.us
The Savannah-Upper Ogeechee Regional Water Planning Council is holding its next meeting at the following time, date and location: 9:00 a.m. – 4:30 p.m., May 7, 2009, Savannah Rapids Pavilion ,3300 Evans to Locks Road – Martinez, GA 30907
For additional information about the Savannah-Upper Ogeechee Regional Water Planning Council please contact:
Jeff Larson, Assistant Branch Chief – EPD Watershed Protection Branch, 404-675-1664, Jeff.Larson@dnr.state.ga.us
The Suwannee-Satilla Regional Water Planning Council is holding its next meeting at the following time, date and location: 9:00 a.m. – 4:30 p.m., May 6, 2009, C. E. Weir Center, 307 Bryan Street East, Douglas, GA 31533
For additional information about the Suwannee-Satilla Regional Water Planning Council please contact:
Rob McDowell, Assistant Branch Chief – EPD Watershed Protection Branch, 404-675-1650, Rob.McDowell@dnr.state.ga.us
The Upper Flint Regional Water Planning Council is holding its next meeting at the following time, date and location: 9:00 a.m. – 4:30 p.m., May 1, 2009, One Griffin Center, Commissioner’s Meeting Room, 100 South Hill Street Griffin, GA 30223
For additional information about the Upper Flint Regional Water Planning Council please contact:
Tim Cash, Assistant Branch Chief - EPD Watershed Protection Branch' 404-675-1766, Tim.Cash@dnr.state.ga.us
The Upper Oconee Regional Water Planning Council is holding its next meeting at the following time, date and location: 9:00 a.m. – 4:30 p.m., May 8, 2009, Rock Eagle 4H Center – Rich Building ,350 Rock Eagle Road, Eatonton, GA 31024
For additional information about the Upper Oconee Regional Water Planning Council please contact:
Kevin Farrell, Assistant Branch Chief – EPD Watershed Protection Branch, 404-675-1621, Kevin.Farrell@dnr.state.ga.us
Monday, February 16, 2009
Groundwater Primer PLUS- potable vs irrigation
There are two fundamental things I encounter as I speak with potential well owners for the first time- a misconception about what we call 'groundwater', and a a misunderstanding on the difference between an 'irrigation' or a potable water well.
I'll attempt to clear the air on these issues here as clearly and simply as possible.
Individual household water wells are the preferred source of safe drinking water for more than 15 million Americans. If you have a properly constructed, drilled well your water comes from deep in the bedrock and is naturally filtered and should be bacteria free. In the rregions we service (Southern Appalachia/ Georgia Piedmont), groundwater is located in fractures in consolidated rock. It occurs as water is slowly pulled through bedrock into cracks and crevices in the rock. It does not deplete the water table, and, except in extremely rare occasions, will not affect even your nearest neighbor’s well.
This type of system is one of the safest most reliable drinking water sources available.
As the average person in the US uses around 150 gallons per day, and the average household peak demand less than 10 gallons per minute (gpm), almost any hole in the ground will supply enough water to satisfy an individual's potable water needs.
An irrigation well is essentially a commercial well- the demands of an irrigation system are so much greater than regular home use:
Where a potable water system in a typical Atlanta home may have a peak demand of 8 gpm and average 500 gallons per day, that same residence may have an irrigation system which needs 20 or more gallons per minute and over 20,000 gallons in a single event. It is as if that one well is being asked to supply 20 or 30 homes.
That same ultra-purified water is pulled out of the bedrock in a much higher volume and at a much faster flow rate. Bigger pumps running on bigger wire, pushing water through bigger pipe, and controlled by extremely complex equipment make this kind of system work.
The irrigation system is usually already in place when we construct our wells, and the volume and flow rates don't always operate the same as our high-pressure municipal systems.
Sometimes, these systems are required to pump faster than the ground can yield water, and that deficit has to be made up in reserve- either inside the well or in storage tanks. It can also be made up in time, and the irrigation system has to be staged to allow the well to recharge its self. However it is done, these systems can easily double or triple the typical residential user's cost.
A water well is an investment in the commodity of the future. Well owners have their own private water system which they control. With proper maintenance, these systems should provide a lifetime of safe, reliable access to pure, fresh water.